







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Richardson
If you’re adding a master suite, a second story, or a detached ADU on your Richardson lot, you’ve probably already found that the hardest part isn’t picking finishes. It’s figuring out whether the existing slab under a 1960s – 1980s ranch home can carry the new load. Richardson experienced one of the largest single-wave suburban buildouts in North Texas, and we know what that means for additions here: the same clay cycles, the same aging foundations, the same question about whether the county or the city holds the permit. We scope foundation evaluation, utilities, and grading before we ever quote finishes, so a fixed bid doesn’t turn into a change order. Call (844) 761-9152 to schedule your free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Why Richardson Homeowners Call Construction McKinney for Home Additions & ADU

Richardson is not a greenfield market. Most of the homes we’re asked to expand sit on single-story ranch slabs poured during the Telecom Corridor wave, and the soil under them (blackland clay) moves hard with the wet-dry cycle. A general contractor who quotes an addition without looking at the slab is quoting half a project. Our technicians have up to 10 years of experience with slab construction, pier-and-beam remediation, and detached ADU builds in this soil, and we bring in a structural engineer on almost every addition we scope in Richardson for exactly that reason.
We’re licensed and insured, we pull permits and pass inspection sign-off on the work, and we give you a written line-item estimate before any work starts so you can see what’s foundation, what’s structure, and what’s finish. Our first real answer to a Richardson homeowner is almost never “here’s the design budget.” It’s “let’s find out what your slab is doing.” We also work the metroplex regularly, so we know the drive times from Plano and Allen into the Richardson neighborhoods off Central Expressway, and we know what a slab crack opening after a dry summer actually means for a new footing tie-in.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Richardson
New Detached ADU
A detached ADU on a Richardson lot gives you a full-suite secondary dwelling, which is why this is the most-requested ADU configuration here. The build is a standalone structure with its own foundation, utilities, and tie-in to your existing service, so grading, drainage, and site access matter as much as the floor plan. We handle both site-built and prefab paths, including platforms like Abodu and Dvele, and we’re clear with you about which route fits your lot and your inspection timeline.

Garage Conversion ADU
Converting a garage into an ADU is often the fastest path to additional living space on a Richardson lot, because you’re reusing an existing slab and existing utility stubs. The complications are almost always structural and code-related: raising the slab if it’s below grade, upgrading the electrical service to support kitchen and bath loads, and confirming that the county doesn’t require a replacement parking pad. We scope each of those as line items before we quote.

Room Additions
A room addition on a single-story ranch usually means a new bearing wall, a new footing, and a tie-in to the existing roof and slab. If your slab has already showed clay-cycle movement, the addition needs pier work scoped first, or the new footing won’t pass inspection sign-off. We price the foundation remediation as its own line so you can see exactly what the existing structure costs to make ready before the new square footage goes on.

ADU Design & Permitting
On an unplatted or larger Richardson lot, permitting can run through the county rather than the city, and the setbacks that govern a detached ADU, well isolation, and septic leach field are county rules, not the city numbers you might assume. We confirm those setbacks and the permit authority before design starts, because a plan that’s drawn to the wrong setback is a plan that has to be redrawn.
Trusted Brands We Service in Richardson
For ADU builds we work with modular platforms such as Abodu and Dvele alongside traditional site-built construction, which lets us match the method to your lot, your timeline, and your inspection path rather than pushing one approach. Prefab systems like Cover offer another option where the site logistics make a factory-built unit the better call. If your addition includes new windows or exterior doors, we spec impact-rated and specialty window lines alongside trusted door brands like Therma-Tru. We don’t claim to stock parts locally, but we do know the lead times on these products in the Richardson market, and we build them into the schedule instead of discovering them mid-build.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Richardson Homes
- Pricing an addition on a slab that’s already moving. The blackland clay under Richardson expands and contracts dramatically with the wet-dry cycle, and when the existing slab shows old movement, the pier work has to be scoped before the new footing is designed. Skip that step and the discovery comes back as a change order after the rough-in is in.
- Quoting a detached ADU or garage conversion without confirming county setbacks. On larger or unplatted lots, the county may require a bigger leach field or a wider well isolation than the city setback the homeowner assumed. We verify the authority before we draw anything.
- Underestimating material access on acreage. A concrete truck or crane can’t always reach the build site without a temporary driveway or an engineered pad. That’s a real cost to scope up front, not a surprise to absorb later.
- Forgetting drainage and grading on an open lot. Richardson lots that drain toward a slab or toward a new ADU foundation need positive grading planned from the start, or the structure inherits the same water problem the existing house had.
Pricing for Home Additions & ADU in Richardson, TX

Pricing on additions in Richardson is driven by foundation condition and site access more than by finishes. A typical home addition in Richardson runs $45,000 – $130,000. A detached ADU or full ADU construction typically runs $90,000 – $220,000. A garage conversion ADU typically runs $30,000 – $80,000. Those ranges assume a slab that doesn’t need significant remediation and a build site a truck can reach; if pier work or a temporary driveway is required, that’s priced as its own line before you sign anything. The written estimate sets the final price.
| Project Type | Typical Estimated Range in Richardson |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Call (844) 761-9152 for a free estimate on your Richardson project. Estimates are free and every scope is written line by line.
We Also Serve Cities Near Richardson
Homeowners in Plano, Addison, Carrollton, and Allen call us for the same reasons Richardson does: aging slab homes, tired garages, and lots that will support a detached unit. If you’re planning an addition anywhere in that ring, reach out to our home additions & ADU team and we’ll walk you through what your foundation and your lot will actually support before you commit to a design.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Richardson

Because the blackland clay under Richardson moves so dramatically with the wet-dry cycle that the existing slab, not the floor plan, is the first real gate on the project. Most additions here sit on 1950s – 1980s ranch slabs poured during the Telecom Corridor wave, and pier work often has to be scoped and priced before the first footing is poured. If the existing foundation keeps moving, the new load-bearing tie-in won’t pass inspection, so a structural engineer’s evaluation protects both the design and the budget. Call (844) 761-9152 for a free estimate.
It can go through the county rather than the city, especially on larger or unplatted lots. The setback that governs your ADU, well isolation, and leach field may be a county requirement that’s different from the city setback you’d assume. We confirm the permit authority and the actual setbacks before design starts, so the plan doesn’t have to be redrawn. Call (844) 761-9152 to talk through your lot.
We scope access before we quote. On acreage properties, a concrete truck or crane often can’t reach the build site without a temporary driveway or an engineered pad, and that’s a cost that has to be line-itemed up front rather than discovered mid-build. Long material hauls get factored into the schedule too. Call (844) 761-9152 for a free estimate on your Richardson lot.
A garage conversion ADU in Richardson typically runs $30,000 – $80,000 and includes raising or leveling the slab where needed, upgrading the electrical service for kitchen and bath loads, insulation, finishes, and confirming with the county whether a replacement parking pad is required. The price is held by line-item scope: everything the conversion needs is written into the estimate before work starts, and any condition we find mid-build gets documented and priced in writing before it proceeds. The written estimate sets the final price. Call (844) 761-9152 for a free estimate.
A permit is required for essentially any room addition, second story addition, sunroom, or enclosed patio that adds conditioned square footage or changes the structure, and most cities also require one for a detached ADU. Inspection sign-off checks the foundation and footings, the structural tie-in to the existing house, framing, electrical, plumbing, and final grading. We pull the permits and carry the project through sign-off. Call (844) 761-9152 for a free estimate.
Written by the team at Construction McKinney.












